* Sludge removal from the settling basin Makiš. Quantity 180.000 m3. (with company HIDRO - BAZA Belgrade)
Investor: Public utility company Beogradski vodovod i kanalizacija.
* Dredging of riverbed sediment, Germany. Quantity 270.000 m3. (with company HIDRO - BAZA Belgrade)
Investor: DHSV - Deich und Hauptsielverband Dithmarschen
* Excavation of the underwater trench at the bottom of Lake Skadar for building waterworks. Quantity: 180,000 m3.
Investor: JP Regionalni vodovod Crnogorsko primorje, Budva, Montenegro.
* Sludge removal from cooling water channels at TEKO B Kostolac.
Quantity: 500,000 m3.
Investor: PD »Termoelektrane i kopovi« Kostolac.
* Sludge removal from the settling basin Makiš. Quantity: 200,000 m3.
Investor: Public utility company Beogradski vodovod i kanalizacija.
* The deepening and cleaning of the waterway for Virpazar channel.
Quantity: 18.000 m3.
Investor: Uprava pomorske sigurnosti, Bar, Montenegro.
* Cleaning the beach "Old town" in Šabac - sludge removal and the excavation of sand of the Sava riverbed using the navigable dredge.
Quantity: 20,000 m3.
Investor: Javno preduzeće za upravljanje građevinskim zemljištem Šabac.
* Dredging of dock coast for Pančevo Oil Refinery in Zone 0, I and II. Permanent works. Quantity: 40,000 m3.
Investor: NIS ad Novi Sad, NIS-Oil Refinery.
* Cleaning the beach "Kostolac Dunavac" in Kostolac and building fishing path. Quantity: 11,800 m3.
Investor: Sport Fishing Association DUNAVAC "Kostolac.
* Sludge removal and filling the underwater beach area by sand on the lake Srebrno jezero. Quantity: 19,000 m3.
Investor: "Silver Lake Investment" Ltd. Belgrade.
* Sludge removal by navigable dredge from the bottom of the lake Srebrno jezero. Quantity: 61,600 m3.
Investor: Ministry of Tourism and regional development.
* Cleaning the entrance of the channel for cooling water (by sludge removal) and cleaning the lake in front of the power plant "Kostolac" B pumping station. Quantity: 50,00 0 m3.
Investor: PD "Termoelektrane i kopovi" Kostolac.
* Dredging the ramp for boats by removing dredged material into the Sava River in the Shipyard "Sava" in Mačvanska Mitrovica. Permanent works. Quantity: 30,000 m3.
Investor: Shipyard "Sava" AD Mač.Mitrovica and "Team" Ltd. Sremska Mitrovica.
* Cleaning the gating channel by refilling dredge and material dispose by pontoon pipes into the river Danube, and removing the sediment from the channel bed, for the "CHP" Novi Sad. Quantity: 5,000 m3.
Investor: "Phoenix industrial" Ltd Belgrade.
* Sludge removal of the main channel »Plavna by refilling dredge.
Quantity: 43,000 m3.
Investor: V.D.«Dunav« AD Bačka Palanka.
* Excavation of the entrance of the channel for Fertilizer Plant in Pančevo.
Quantity: in total 60.000 m3.
Investor: HIP-Azotara Pančevo.